RobHerrington
Member
Here is my new and improved e-bin. Note that I simply bent the re-bar in half to double it's surface area, and no need for a jumper. Also note the iron but coated cookie sheet on opposite side with jumper. Could have sanded the pan but it's already very magnetic. I was fantasizing that I was Superman as I heroically bent the re-bar.
Also decided to fortify the connection with my heavy duty jumper cables. My "new" but extremely cruddy Griswold #11 slant is in there now. Too tall to get handle submerged, but it's not in bad shape anyway.
https://www.dropbox.com/s/85eo0062nhp8iae/IMG_20170319_123942748.jpg?dl=0
And note, in next post, that I am now drawing a more respectable 4 Amps, compared to the 2 from my last configuration.
Also decided to fortify the connection with my heavy duty jumper cables. My "new" but extremely cruddy Griswold #11 slant is in there now. Too tall to get handle submerged, but it's not in bad shape anyway.
https://www.dropbox.com/s/85eo0062nhp8iae/IMG_20170319_123942748.jpg?dl=0
And note, in next post, that I am now drawing a more respectable 4 Amps, compared to the 2 from my last configuration.