Setting up my first e tank and would like to use rebar from local HD. Its already cut to a useable length and would last a while I think. So rather than use a bar or two I was going to make a wired together grid for each side. Having put rebar in foundations before I have a great easy wrap wiring tool to wrap them tight at intersections. Three horizontal and three vertical in an equal grid. One for each side and then wired together. As I've never done this before just wanted to check. Thanks for any input.
This is the charger I have and plan to use...
http://www.amazon.com/gp/product/B0009IBJBM?psc=1&redirect=true&ref_=oh_aui_detailpage_o03_s00
I hope to start cleaning up some CI items I have and putting them into service !
This is the charger I have and plan to use...
http://www.amazon.com/gp/product/B0009IBJBM?psc=1&redirect=true&ref_=oh_aui_detailpage_o03_s00
I hope to start cleaning up some CI items I have and putting them into service !